Skip to product information
REST® Evercool®+ Cooling Pillowcases Standard - 2 Pillowcases for Sensitive Skin, Silver Infused Fabric for Hygienic Sleep, Silky Smooth for Curly Hair, High Elastic for Snug Fit (19x29 inches)
$88.48
Shipping calculated at checkout.
About This
- Instant Cooling: Experience sleeping on the cold side of the pillow with Rest’s advanced cooling pillowcases; Wake up refreshed and rejuvenated with cutting-edge performance fabric that offers instant and long-lasting cooling sensation; Evercool pillowcases are ideal for all seasons and hot sleepers with night sweats, hot flashes
- Luxuriously Soft and Smooth: Science-backed fabric innovation that’s softer, smoother and stronger than silk; Glides effortlessly against your skin for frictionless sleep and prevent crush wrinkles caused by side sleeping; Elevate your sleep with unbelievable comfort
- Always a Good Hair Day: Reduce friction, prevent frizz and hair damage with Evercool’s ultra-fine, super smooth fabric; Curly and wavy hair approved with our anti-static cooling pillowcases that don’t pull or tug; Don’t wake up tired or with messy hair ever again
- Self-Cleaning Fabric Tech: Lasting hygienic pillowcases for sensitive skins. With Noble's Ionic+ extruded silver yarn technology, positively charged silver ions are permanently embedded into Evercool+ fiber; The pillow case is self-cleaning to effectively inhibit and eliminate odor
- Stain Resistant: Resistant to oil absorption; The pillowcases will always look and feel brand new, without stains or color fading; Plus, you can rest assure any skin care products will stay where they belong, and you can look and feel your best
Overview
- Size : Standard (2 pcs)
- Material : Evercool+ Performance Fabric
- Brand : REST
- Color : Midnight Blue
- Product Care Instructions : Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabric softener. Drying: 1) Tumble dry on low/no heat or line dry. 2) Don't use iron. 3) Don't dry clean. Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabric softener. Drying: 1) Tumble dry on low/n… See more